| 20.06.1 m |
EXTENSIVE FLOODING OF MANY HOMES AND BUSINESSES WILL RESULT ON RIVERSIDE ROAD. SECTIONS OF RIVERSIDE ROAD WILL BE UNDER WATER. |
| 17.05.2 m |
MAJOR FLOODING BEGINS. THE FULTON COUNTY WATER POLLUTION CONTROL FACILITY WILL FLOOD BETWEEN 17 AND 17.5 FEET. EVE ROAD BEGINS TO FLOOD. NUMEROUS HOMES ARE FLOODED. |
| 14.04.3 m |
MODERATE FLOODING BEGINS. EXTENSIVE FLOODING OF YARDS AND SOME HOMES DEVELOPS ON PARTS OF RIVERSIDE ROAD IN NORTH FULTON COUNTY. |
| 13.04.0 m |
FLOOD STAGE IS REACHED AND MINOR FLOODING BEGINS. FLOOD WATERS WILL NEAR LOW AREAS OF RIVERSIDE ROAD. FLOOD WATERS WILL COVER SOME WALKWAYS...YARDS...AND ACCESS ROADS NEAR RIVERSIDE ROAD. |
| 11.03.4 m |
DON MEMORIAL PARK BEGINS TO GET HIGH WATER LOCATED NEAR GEORGIA 400. |