| 38.011.6 m |
MAJOR FLOODING CONTINUES. THE HIGHWAY 27 BRIDGE IS FLOODED OUT. |
| 30.09.1 m |
MAJOR FLOODING EXPANDS. PUMPING STATION AT GEORGIA POWER PLANT WANSLEY...12 MILES DOWNSTREAM...FLOODS. |
| 28.08.5 m |
MAJOR FLOODING CONTINUES. RIVER INTAKE BUILDINGS FLOOD AT GEORGIA POWER PLANT YATES. |
| 26.07.9 m |
MAJOR FLOODING BEGINS. SMALL COFFER DAMS...AT GEORGIA POWER PLANT WANSLEY 12 MILES DOWNSTREAM...BEGIN TO BE OVERTOPPED. |
| 21.06.4 m |
MODERATE FLOODING BEGINS. SOME ACCESS ROADS ARE FLOODED. MORE FARM AND PASTURE LAND ARE FLOODED OUT. |
| 19.05.8 m |
MINOR FLOODING OCCURS TO SOME UNIMPROVED DIRT ROADS. |
| 18.05.5 m |
MINOR FLOODING CONTINUES. FARM AND PASTURE LAND BEGIN TO FLOOD AND SOME EVACUATION OF LIVESTOCK IN THE FLOOD PLAIN OF THE RIVER IS REQUIRED. A SOD FARM UPSTREAM ALSO EXPERIENCES FLOODING. |
| 17.05.2 m |
MINOR FLOODING CONTINUES. PAYTON ROAD BRIDGE NEAR CLIFF PAYTON CIRCLE FLOODS. |
| 16.04.9 m |
MINOR FLOODING EXPANDS. BOAT RAMP PARKING LOT FLOODS. |
| 15.04.6 m |
FLOOD STAGE IS REACHED AND MINOR FLOODING OCCURS. FLOOD WATERS REACH TOP OF BOAT RAMP. |